Committee |
Date Time |
Place |
Paper Title / Authors |
Abstract |
Paper # |
R |
2025-03-14 14:00 |
Hyogo |
(Hyogo) |
Optimal Operation Policies for a System with Random Variable of Operational Period Satoshi Mizutani, Toshio Nakagawa (AIT) |
[more] |
|
R |
2024-12-05 14:40 |
Tokyo |
Kikai-Shinko-Kaikan Bldg. (Tokyo, Online) (Primary: On-site, Secondary: Online) |
Optimal Operation Policies for a System with Resting Period Satoshi Mizutani, Toshio Nakagawa (AIT) R2024-40 |
This paper considers some system with operating period and stopping period, and it consists of one unit. We consider som... [more] |
R2024-40 pp.7-11 |
R |
2023-07-28 15:05 |
Hokkaido |
(Hokkaido, Online) (Primary: On-site, Secondary: Online) |
Balancing Cost for Periodic Replacement Policies with Minimal Repair Satoshi Mizutani, Toshio Nakagawa (AIT) R2023-15 |
[more] |
R2023-15 pp.28-32 |
MRIS, ITE-MMS |
2023-06-09 11:10 |
Miyagi |
Tohoku Univ. (RIEC) (Miyagi, Online) (Primary: On-site, Secondary: Online) |
Thermal activation process in microwave assisted switching Nobuaki Kikuchi, Katsunari Sato, Satoshi Mizutani, Masatoshi Hatayama, Takehito Shimatsu, Satoshi Okamoto (Tohoku Univ.) MRIS2023-7 |
Microwave-assisted magnetization switching is a technology, which can reduce the switching field by applying a GHz-band ... [more] |
MRIS2023-7 pp.37-42 |
R |
2023-05-27 13:30 |
Aichi |
Aichi University (Aichi, Online) (Primary: On-site, Secondary: Online) |
Balancing Maintenance Costs of Replacement Models Satoshi Mizutani, Toshio Nakagawa (AIT) R2023-1 |
[more] |
R2023-1 pp.1-5 |
R |
2022-05-28 13:25 |
Online |
Online (Online) |
Equilibrium Maintenance Costs of Random Replacement between Age and Periodic Replacements Satoshi Mizutani, Toshio Nakagaws (AIT) R2022-2 |
We consider a random replacement policy in which a unit is replaced at random time. It is known that age and periodic re... [more] |
R2022-2 pp.7-11 |
R |
2021-07-17 13:25 |
Online |
Virtual (Online) |
Numerical Analysis for Inspection Policies which Minimize the Expected Cost Rate Satoshi Mizutani, Toshio Nakagawa (AIT) R2021-17 |
We consider some modified sequential inspection policies which minimize the expected cost rates
and show its numerical ... [more] |
R2021-17 pp.7-11 |
MRIS, ITE-MMS |
2021-06-10 13:55 |
Miyagi |
RIEC, Tohoku U. (Miyagi, Online) (Primary: On-site, Secondary: Online) |
Effect of thermal fluctuations on microwave assisted switching in Co/Pt nanodot array Satoshi Mizutani, Nobuaki Kikuchi, Masatoshi Hatayama, Satoshi Okamoto, Takehito Shimatsu (Tohoku Univ.) MRIS2021-2 |
Microwave assisted magnetization switching (MAS) has been gathered wide interests as one of the prominent technologies f... [more] |
MRIS2021-2 pp.7-11 |
R |
2021-05-28 15:00 |
Online |
Online (Online) |
Numerical Comparison and Consideration for Redundant System using Extended Age Replacement Policy Satoshi Mizutani, Toshio Nakagawa (AIT) R2021-6 |
This chapter considers optimal replacement policies with random times to replace redundant systems. Especially, it is as... [more] |
R2021-6 pp.30-34 |
R |
2020-12-11 14:25 |
Online |
Online (Online) |
Maintenance Policies for Redundant Systems using Random K-out-of-n System Satoshi Mizutani, Toshio Nakagawa (AIT) R2020-31 |
[more] |
R2020-31 pp.7-11 |
R |
2019-10-25 15:05 |
Nagasaki |
Fukue Culture Center (Nagasaki) |
Replacement Policies for Independent Shock Model with Threshould Level to Replace at Some Shocks Satoshi Mizutani, Toshio Nakagawa (AIT) R2019-40 |
[more] |
R2019-40 pp.13-17 |
R |
2019-05-24 13:00 |
Aichi |
Aichi Institute of Technology, Motoyama Campus (Aichi) |
Replacement First and Last Policies for Two Failure Modes Satoshi Mizutani, Toshio Nakagawa (AIT) R2019-1 |
[more] |
R2019-1 pp.1-5 |
R |
2018-12-15 16:25 |
Okinawa |
(Okinawa) |
Which is better to replace at number of works or failures Satoshi Mizutani, Toshio Nakagawa (AIT) R2018-50 |
This paper proposes some replacement policies in which the unit is replaced at $N$th working cycle or $K$th failure. We ... [more] |
R2018-50 pp.41-46 |
R |
2018-05-25 14:00 |
Aichi |
Aichi Institute of Technology, Motoyama Campus (Aichi) |
Extended Overtime Replacement Policies for Cumulative Damage Model Satoshi Mizutani, Toshio Nakagawa (AIT) R2018-1 |
[more] |
R2018-1 pp.1-6 |
R |
2016-05-28 13:25 |
Aichi |
WINC AICHI (Aichi) |
Maintenance Overtime Poclicies with replacement at N project cycles over a planned time Satoshi Mizutani (AUT), Toshio Nakagwa (AIT) R2016-2 |
This paper proposes extended models for maintenance overtime policy. We assume that the unit is replaced at $N$th ($N=1,... [more] |
R2016-2 pp.7-12 |