Committee |
Date Time |
Place |
Paper Title / Authors |
Abstract |
Paper # |
R |
2022-12-15 15:45 |
Online |
Online |
The trends of IEC/TC 56 Dependability Ko Kawashima (ORIENTAL MOTOR), Yoshinobu Sato (Institute for Healthcare Quality Improvement), Yoshiki Kinoshita (Kanagawa Univ.), Hiroyuki Goto (D.SS), Akihiko Masuda (Reliability Seven Tools (R7) Practice Studio), Shigeru Yanagi (National Defense Academy), Makoto Takeyama (Kanagawa Univ.), Tadahiro Shibutani (Yokohama National Univ.) R2022-47 |
IEC/TC 56 is in charge of developing and revising international dependability standards related horizontally to both of ... [more] |
R2022-47 pp.19-24 |
R |
2017-05-26 14:00 |
Okayama |
Purity Makibi |
Three Repair Options Depending on Failure Time Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2017-4 |
A maintenance model depending on occurrence times of failures is proposed. For a system equipped on a vehicle such as a ... [more] |
R2017-4 pp.19-24 |
R |
2016-12-16 15:05 |
Kanagawa |
Maholoba Minds Miura (Miura City, Kanagawa Prefecture) |
[Invited Talk]
Spare Parts Provisioning for a Multi-echelon Repair System Shigeru Yanagi (NDA) R2016-56 |
[more] |
R2016-56 pp.13-18 |
R |
2016-10-21 14:30 |
Okinawa |
Okinawaken Seinenkaikan |
Maintenance Policies for a System with Random and Pre-determined Working Time Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2016-44 |
[more] |
R2016-44 pp.13-18 |
R |
2016-10-21 14:55 |
Okinawa |
Okinawaken Seinenkaikan |
Reliability Analysis of Redundant Systems Considering Common-Cause Failure Megumi Maruyama, Tetsushi Yuge, Shigeru Yanagi (NDA) R2016-45 |
[more] |
R2016-45 pp.19-24 |
R |
2016-07-29 15:45 |
Hokkaido |
Otaru Chamber of Commerce and Industry |
Optimal Maintenance Policy for a System Equipped on Ship Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2016-18 |
[more] |
R2016-18 pp.31-36 |
R |
2015-10-16 12:00 |
Fukuoka |
|
Maintenance Modelling for a system on Navy Ship Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2015-55 |
[more] |
R2015-55 pp.21-25 |
R |
2015-07-31 14:10 |
Aomori |
|
Replacement Manegement for a One-Shot System with Minimal Repair Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2015-16 |
[more] |
R2015-16 pp.13-17 |
R |
2014-12-19 14:05 |
Tokyo |
|
Availability Measure of One-shot Systems with Minimal Repair Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2014-67 |
One-shot system is a kind of systems that can be used only once during its life, whose failures are detected only throug... [more] |
R2014-67 pp.13-18 |
R |
2014-08-01 16:45 |
Hokkaido |
Smile Hotel Hakodate |
Optimal Inspection policies for a One-shot System with Minimal Repair Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (National Defense Academy) R2014-21 |
[more] |
R2014-21 pp.43-48 |
R |
2014-06-13 14:45 |
Tokyo |
|
Failure Probability of a k-out-n System Considering Common-cause Failures Tetsushi Yuge, Shigeru Yanagi (NDA) R2014-12 |
[more] |
R2014-12 pp.19-24 |
R |
2013-12-13 13:45 |
Tokyo |
|
A two-echelon repair system including priority resupply and cannibalization in a dual-system Yosuke Aizu, Tetsushi Yuge, Shigeru Yanagi (NDA) R2013-80 |
In this paper, we propose a realistic model of a two-echelon repairable-item inventory system considering the priority r... [more] |
R2013-80 pp.7-12 |
R |
2013-10-18 15:25 |
Fukuoka |
|
On the estimation of common-cause failure rates Tetsushi Yuge, Megumi Maruyama, Shigeru Yanagi (NDA) R2013-68 |
[more] |
R2013-68 pp.25-30 |
R |
2013-07-26 16:45 |
Hokkaido |
未定 |
A study of the effect of priority resupply on a two-echelon repair system Yosuke Aizu, Tetsushi Yuge, Shigeru Yanagi (NDA) R2013-27 |
In this paper, we propose a realistic model of a two-echelon repairable-item inventory system considering the priority r... [more] |
R2013-27 pp.43-48 |
R |
2012-05-25 16:55 |
Shimane |
|
Bayesian Networks Modeling for Dynamic Fault Tree Tetsushi Yuge, Shigeru Yanagi (National Defense Academy) R2012-9 |
[more] |
R2012-9 pp.47-52 |
R |
2011-07-29 15:50 |
Hokkaido |
|
Dynamic Fault Tree Analysis using Bayesian Networks Tetsushi Yuge, Nobuyuki Tamura, Shigeru Yanagi (NDA) R2011-25 |
[more] |
R2011-25 pp.37-42 |
R |
2010-12-17 13:25 |
Tokyo |
|
On Sum of Disjoint Products Method considering Cut Sequences Taijirou Yoneda, Tetsushi Yuge, Nobuyuki Tamura, Shigeru Yanagi (NDA) R2010-38 |
In the case of transforming the minimal cut sequences(MCSSs) into disjoint cut sequences, the number of disjoint sequenc... [more] |
R2010-38 pp.7-11 |
R |
2010-07-30 13:40 |
Yamagata |
|
Dynamic Fault Tree Analysis by using Cut Sequence Sets Taijirou Yoneda, Tetsushi Yuge, Nobuyuki Tamura, Shigeru Yanagi (NDA) R2010-18 |
We propose a method of calculating the top event probability of a fault tree with priority AND gates using the minimal c... [more] |
R2010-18 pp.7-12 |
R |
2010-05-28 13:20 |
Tottori |
|
Structural Properties of an Optimal Maintenance Policy for a Two-State POMDP Model Nobuyuki Tamura, Kenichi Hayashi, Tetsushi Yuge, Shigeru Yanagi (NDA) R2010-9 |
[more] |
R2010-9 pp.13-18 |
EMD, R |
2010-02-19 14:50 |
Osaka |
|
Cut Set Analysis of Fault Tree with Priority AND Gates Taijirou Yoneda, Tetsushi Yuge, Nobuyuki Tamura, Shigeru Yanagi (NDA) R2009-55 EMD2009-122 |
We propose a method for calculating the exact top event probability of a fault tree with priority AND gates using the mi... [more] |
R2009-55 EMD2009-122 pp.31-36 |