Committee |
Date Time |
Place |
Paper Title / Authors |
Abstract |
Paper # |
R |
2023-07-28 10:45 |
Hokkaido |
(Primary: On-site, Secondary: Online) |
Algorithm for stochastic flow network interdiction problem Kazuki Hayashi, Natsumi Takahashi, Tetsushi Yuge (NDA) R2023-10 |
In this paper, we consider the network interdiction problem using the expected profit as a metric. The objective is to m... [more] |
R2023-10 pp.1-6 |
R |
2023-03-10 15:50 |
Hiroshima |
(Primary: On-site, Secondary: Online) |
Search Space Reduction using Neighborhood in Genetic Algorithm Natsumi Takahashi, Tetsushi Yuge (NDA), Tomoaki Akiba (CIT) R2022-54 |
In this study, we consider two-objective network design problem with all-terminal reliability and construction costs. Th... [more] |
R2022-54 pp.37-40 |
R |
2022-07-29 16:15 |
Hokkaido |
(Primary: On-site, Secondary: Online) |
System availability analysis of two-echelon repair system considering simultaneous failures Naoto Okubo, Natsumi Takahashi, Tetsushi Yuge (NDA) R2022-15 |
The two-echelon repair system is a type of multi-echelon repair system. The maintenance facilities in the system are div... [more] |
R2022-15 pp.36-41 |
R |
2019-06-14 14:00 |
Tokyo |
Kikai-Shinko-Kaikan Bldg. |
Simultaneous and concentrated failure model and reliability Tetsushi Yuge (NDA) R2019-9 |
[more] |
R2019-9 pp.1-6 |
R |
2018-11-15 15:55 |
Osaka |
|
Some topics on common-cause failure analysis Tetsushi Yuge (NDA) R2018-42 |
[more] |
R2018-42 pp.23-28 |
R |
2017-12-15 14:00 |
Tokyo |
Kikai-Shinko-Kaikan Bldg. |
Common-cause failure analysis by shock models Tetsushi Yuge (NDA) R2017-56 |
Redundant structures are often used to improve system reliability. However, the reliability of a redundant system decrea... [more] |
R2017-56 pp.1-6 |
R |
2017-05-26 14:00 |
Okayama |
Purity Makibi |
Three Repair Options Depending on Failure Time Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2017-4 |
A maintenance model depending on occurrence times of failures is proposed. For a system equipped on a vehicle such as a ... [more] |
R2017-4 pp.19-24 |
R |
2016-10-21 14:30 |
Okinawa |
Okinawaken Seinenkaikan |
Maintenance Policies for a System with Random and Pre-determined Working Time Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2016-44 |
[more] |
R2016-44 pp.13-18 |
R |
2016-10-21 14:55 |
Okinawa |
Okinawaken Seinenkaikan |
Reliability Analysis of Redundant Systems Considering Common-Cause Failure Megumi Maruyama, Tetsushi Yuge, Shigeru Yanagi (NDA) R2016-45 |
[more] |
R2016-45 pp.19-24 |
R |
2016-07-29 15:45 |
Hokkaido |
Otaru Chamber of Commerce and Industry |
Optimal Maintenance Policy for a System Equipped on Ship Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2016-18 |
[more] |
R2016-18 pp.31-36 |
R |
2015-10-16 12:00 |
Fukuoka |
|
Maintenance Modelling for a system on Navy Ship Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2015-55 |
[more] |
R2015-55 pp.21-25 |
R |
2015-07-31 14:10 |
Aomori |
|
Replacement Manegement for a One-Shot System with Minimal Repair Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2015-16 |
[more] |
R2015-16 pp.13-17 |
R |
2014-12-19 14:05 |
Tokyo |
|
Availability Measure of One-shot Systems with Minimal Repair Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2014-67 |
One-shot system is a kind of systems that can be used only once during its life, whose failures are detected only throug... [more] |
R2014-67 pp.13-18 |
R |
2014-08-01 16:45 |
Hokkaido |
Smile Hotel Hakodate |
Optimal Inspection policies for a One-shot System with Minimal Repair Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (National Defense Academy) R2014-21 |
[more] |
R2014-21 pp.43-48 |
R |
2014-06-13 14:45 |
Tokyo |
|
Failure Probability of a k-out-n System Considering Common-cause Failures Tetsushi Yuge, Shigeru Yanagi (NDA) R2014-12 |
[more] |
R2014-12 pp.19-24 |
R |
2013-12-13 13:45 |
Tokyo |
|
A two-echelon repair system including priority resupply and cannibalization in a dual-system Yosuke Aizu, Tetsushi Yuge, Shigeru Yanagi (NDA) R2013-80 |
In this paper, we propose a realistic model of a two-echelon repairable-item inventory system considering the priority r... [more] |
R2013-80 pp.7-12 |
R |
2013-10-18 15:25 |
Fukuoka |
|
On the estimation of common-cause failure rates Tetsushi Yuge, Megumi Maruyama, Shigeru Yanagi (NDA) R2013-68 |
[more] |
R2013-68 pp.25-30 |
R |
2013-07-26 16:45 |
Hokkaido |
未定 |
A study of the effect of priority resupply on a two-echelon repair system Yosuke Aizu, Tetsushi Yuge, Shigeru Yanagi (NDA) R2013-27 |
In this paper, we propose a realistic model of a two-echelon repairable-item inventory system considering the priority r... [more] |
R2013-27 pp.43-48 |
R |
2012-05-25 16:55 |
Shimane |
|
Bayesian Networks Modeling for Dynamic Fault Tree Tetsushi Yuge, Shigeru Yanagi (National Defense Academy) R2012-9 |
[more] |
R2012-9 pp.47-52 |
R |
2011-07-29 15:50 |
Hokkaido |
|
Dynamic Fault Tree Analysis using Bayesian Networks Tetsushi Yuge, Nobuyuki Tamura, Shigeru Yanagi (NDA) R2011-25 |
[more] |
R2011-25 pp.37-42 |